04 Release

Decide whether to ship from evidence, not a meeting

TestPlum turns recorded results into one release verdict: ready or not ready. The verdict comes from checks with thresholds you agree in advance, each pass counts by how much it really proves, and every failing check links to the place to resolve it. The portfolio shows the same verdict for every project.

The release verdict card: Not ready, a pass rate of 86.7% against a 95% target and a trusted pass rate of 80%
The release verdict in TestPlum: a Not ready stamp with the checks behind it, each with its target and where to resolve it

What's included

A ready or not-ready verdict from agreed checks, a trusted pass rate, and verdicts for every project.

  • 04.1

    Checks you agree in advance

    Runs in scope, execution completion, pass rate, trusted pass rate, critical tests failing or blocked, open critical bugs and requirements verified, each against a threshold you set.

  • 04.2

    A pass counts by what it proves

    A pass with no assertions, a pass on retry, a flaky test, a test changed since it ran, an unreviewed AI-written test or a manual result without an expected outcome counts only partly.

  • 04.3

    Where to resolve each check

    Every failing check links to where it is fixed: the open runs, the failures to sort, the open bugs, the coverage gaps or the weakest passes.

  • 04.4

    A report to sign

    Print the verdict with its evidence and sign-off lines for the go or no-go meeting, scoped to all active runs, a cycle or one run.

  • 04.5

    Every project's verdict

    The portfolio shows each project's verdict, pass rate and trusted pass rate side by side.

  • 04.6

    Insights behind the verdict

    What to test next by risk, which tests are unstable, who is doing what, and custom reports of your own.

  • 04.7

    Alerts in Slack and Teams

    Post to a channel when a run is signed off, when automated results include failures and when the verdict changes, with a link straight to the run or the release page.

Every project's verdict, side by side

The portfolio in TestPlum: each project's verdict, pass rate and trusted pass rate

In practice

How it goes

  1. Agree the thresholds

    Set the pass rate, completion, coverage and bug limits the release must meet.

  2. Test

    Runs, automation and CI fill in the evidence as results arrive.

  3. Resolve what blocks

    Follow each failing check to the runs, failures, bugs or coverage gaps behind it.

  4. Decide

    Ready or not ready, with the evidence printed and signed.

Questions

Decide whether to ship: frequently asked questions

All questions
What is a trusted pass rate?

A pass rate where each pass counts by how much it proves. A pass with no assertions counts a tenth, a pass on retry or from a flaky test half, a pass from a test changed since it ran or an unreviewed AI-written test 60 percent, and a manual pass without an expected result 70 percent. A green suite of weak tests cannot make a release look ready.

Can I change the release thresholds?

Yes. The pass rate, trusted pass rate, completion, requirement coverage and open critical bug limits are set per verdict, and the scope can be all active runs, one cycle or one run.

Can the team hear when the verdict changes?

Yes. Connect a Slack or Microsoft Teams channel in project settings and choose its alerts: a run signed off, automated results with failures, or the release verdict changing. Each message links to the run or the release page.

Can I see the verdict for every project?

Yes. The portfolio lists every project you can see with its verdict, pass rate, trusted pass rate, open runs and open bugs.

Find out whether your next release is ready

Create a workspace, import your tests or write a few, and record a run. Everything on this site is in the product today.